Priming (siphonic system)
Revision as of 09:16, 7 June 2019 by Joceil.infante (talk | contribs) (Created page with "It is a process in the siphonic rainwater drainage system which different flow patterns takes place as it reached full-bore flow (fully primed state). Priming process is not i...")
It is a process in the siphonic rainwater drainage system which different flow patterns takes place as it reached full-bore flow (fully primed state). Priming process is not instantaneous. It takes place in phases as rainstorm intensity develops.